![]() ![]() ![]() Line-2 ( Green Line) northern extension from Nagasandra to BIEC (3.03 km).Line-1 ( Purple Line) western extension from Mysore Road to Challeghata (8.814 km).Line-1 ( Purple Line) eastern extension from Baiyyappanahalli to Whitefield (15.217 km).The four extensions mentioned above are all under construction and include: Sixteen (16) no of new trains (6 car consists) will be separately procured for which on Board ATC equipment will have to be commissioned and all trains tested to run on the entire Line 1 or Line 2 including extensions. of 3 car trains procured under Phase I will be converted into 6 car train consists (DMC+TC+MC+MC+TC+DMC) by augmenting with additional cars. The notice inviting bids for the signalling system published in August also mentions this –ĥ0 nos. of new 6 cars train sets which have to be operationalized in the existing lines and extensions for which On Board Communication works shall be done under the Scope of the contract No. Provision of On Board communication equipment and associated accessories in new 16 nos. All the 50 numbers of 3 car trains of Phase-I will be converted into 6 car consists by the addition of 2 Motor Cars and 1 Trailer Car. The contractor shall carry out testing of on-board works for conversion from 3 cars to 6 car trains consists, and commission trains as and when the conversion of 6 cars trains consists are completed.ī. Deep within the ‘Brief Scope of Work’ tender document, they’ve mentioned their intention to procure an additional 16 new 6-coach metro trains for the Purple & Green lines on top of the 150 new coaches currently being manufactured by BEML to convert the existing 50 3-coach trains into 6-coaches.Ī. invited bids for commissioning a new communications system for the four new extensions, totaling 33.352 km, of the city’s operational Phase 1 lines under the 73.95 km Phase 2 project. Last week, the Bangalore Metro Rail Corporation Ltd. ⋅ by TMRG ⋅ in Bangalore Metro ⋅ 9 Comments ![]()
0 Comments
Leave a Reply. |